Campus Plan Maps New Buildings For KSU Campus
A drawn map shows permanent buildings and several temporary structures behind the heating plant and Rockwell intramural field. New facilities under construction include a Student Center 800000 and Health Center 230000 with a men’s dormitory 300000 due by March 1949, plus a planned Arts building and gym. The project features a 1000-car parking lot along South drive to Summit and east to the Instruction building, and Memorial Stadium funding is underway on University field. The Kent Stater calls for a bell tower between Moulton hall and the library.