Urgent cleanup of Idaho irrigation system after Teton Dam breach
Federal and state crews mobilize earth moving equipment to clear silt clogged ditches to save 500000 acres of crops in the Upper Snake River Valley. Eight to ten days to restore water, with drones of flood casualties and property damage cited.
MENTIONED IN THIS ARTICLE
Idaho Falls
Idaho
UPI
Teton Dam
Steve Wade
Bureau of Reclamation
Snake River
Wade
Milwaukee ordered to draft desegregation plan
U S District Judge John Reynolds condemned Milwaukee’s desegregation issues aligning them with Boston and Louisville and ordered the School Board to craft a plan by June 30. Special master John Gronouski had proposed voluntary integration, but withdrew key recommendations amid board opposition. The plan targets desegregating one third of Milwaukee’s 158 schools by September.
MENTIONED IN THIS ARTICLE
Milwaukee
Boston
Louisville
U.S
John Reynolds
Reynolds
John Gronouski
Wisconsin
Gronouski
Lloyd Barbee
Pa House approves VW plant incentive plan near Pittsburgh
The Pennsylvania House passed three bills authorizing up to 340 million dollars in state aid to lure Volkswagen to build a Rabbit assembly plant in New Stanton near Pittsburgh. Senate action pending as Volkswagen negotiates the package.
MENTIONED IN THIS ARTICLE
Harrisburg
Pennsylvania
Volkswagen
New Stanton
Pittsburgh
State Senate
Also Mentioned on This Page
John Knebel
Washington
U.S. Geological Survey
David Schleicher
Interior Department Bureau of Reclamation
Bureau
James Moffett
Litchfield Nature Center
Connecticut
Moffett
New York City
Saabs
Peugeots
Audi
Volvo
BMW
Saab
Peugeot
EPA
East Coast
West Coast
Porsche Audi, Ltd
East Molloy Road
Syracuse
Free Spirit
Cross
B. C
Girdies
Sutton
Netra
Sand Gilles
Sie
Taga Content
Avra
AIP