Gas Pipeline Replaced In Shatter-Wasco Area
Southern California Gas Co. pipeline in the Shatter Wasco McFarland Delano system was upgraded by Engineers Limited Pipeline Co. The 4 inch main installed in 1930 was replaced with 8 inch pipe at a cost above 27000 dollars as part of steps to increase gas supply for Tulare and Fresno counties where about 20000 tons of watermelons are grown on 2500 acres this year.
MENTIONED IN THIS ARTICLE
Southern California Gas Co
Engineers Limited Pipeline’ Company
L. T. Yeates
Yeates
Tulare
Fresno County
North High opens as 1952 planning culminates in new campus
Construction follows a 1940 land purchase near the county airport and a 1952 contract to build a modern high school. Groundbreaking occurred March 23, 1952 on the football field as Principal Jack Hill leads planning with staff and graduates from nearby schools. Opening targets 600 students in 9th and 10th grades with 11th and 12th added in subsequent years.
MENTIONED IN THIS ARTICLE
Standard Oil Co
Chester Avenue
Douglas Street
Guy E. Hall
C. B. Alford
W. J. Thomas
Board of Trustees
McCuen
Shafter High School
Jack Hill
North High School
Hill
Standard
Beardsley
Bakersfield High School
Shafter High Adopts Five Minute Bus Departure Change
The Associated Student Body at Shafter High School voted to move bus departures up to five minutes after final class, shortening the previous ten minute wait. This change affects when bus riders reach home from school activities.
MENTIONED IN THIS ARTICLE
Shafter High School
Also Mentioned on This Page
Kern County Press
Eckersfield
North High
KCMS
Ernie Graf
Norma Hagatt
Jerry Earls
Clara Schnaidt
Clara J. Schnaidt
Notary Shafter
Central Ave
Mrs. van Metter
China
Shafter
Memorial Hall
First Baptist Church
E. Lerdo -Highway Shafter, Calif
Mel Krug
Hell
Jesus Christ
Rev. Krug
Bible School
Suzy
Kafy-Tv
Kafy
Kid Klub