Widening of Interstate 680 finally underway between Castro Valley and Dublin
After a decade of debate, about 100 workers begin a seven mile widening of I-680 from Castro Valley to Dublin. The four lane highway will gain an 80 foot center strip for future mass transit, plus a car pool lane and two standard lanes. A court settlement preserves an unused lane for potential future use. Contractor S J Groves and Son and Caltrans supervise earthmoving with seven million cubic yards. Two lanes each direction stay open, but a westbound detour along the north shoulder will start within a week from San Ramon Road Foothill Road to Rowell Ranch Road. A new north Dublin frontage road from Dublin Boulevard to Rowell Ranch Road will also be built.
MENTIONED IN THIS ARTICLE
Ecology
S.J. Groves and Son
California Department of Transportation
San Ramon Road
Foothill Road
Dublin
Rowell Ranch Road
Dublin Boulevard
50 Cent Bridge Tolls Considered in California Plan
CalTrans to the California Toll Bridge Authority discusses lowering Hayward San Mateo and Dumbarton tolls to 50 cents. Elimination of commute discounts might be required to cover a projected $94 700 annual revenue loss. Authority delays action pending Assembly Bill 64 and governor’s decision.
MENTIONED IN THIS ARTICLE
Hayward-San Mateo
Dumbarton
California Department of Transportation
CalTrans
California Toll Bridge Authority
Hayward
Hene Weinreb
South County
Sacramento
Thomas R Lammers
San Francisco
Oakland Bay
Metropolitan Transportation Commission
John Foran
Lammers
Bay Bridge
Also Mentioned on This Page
Inerstate
Castro Valley
Earth
GRADI