Athens Flooring plant to rebuild after fire
H construction and improvements at the Athens Flooring company plant on Bocking street will cost about 25000 dollars and take nine days to complete. Foundations for a platform and kiln will start after debris cleanup. A secure two story addition will house a new trim flooring machine and more saws.
MENTIONED IN THIS ARTICLE
Athens
James H
Conpray Fets New Quarters in Middleport
IPOLEPORT Nov 12 After 12 years at 79 North Second Street Southern China Electric moves to 202 North Second Street in the former Wells Building. The new quarters offer triple the floor space with a display room of household electrical devices and a back office suite. Manager J V Wolte and staff plan a formal opening later as improvements continue and the public is invited to visit.
MENTIONED IN THIS ARTICLE
Ipoleport
North Second Street
Southern China Electric Company
Wells
J. V. Walte
Frieda Carr Jones
Ruth Lette
T. A. May
Wistrict
Wolte Doom Ant
Unclear OCR Summary on Soil and Tree Planting Tips
Fragmentary notes discuss soil types for trees and garden success. Mentions Washington association and planting guidance but details are obscured. Contains garbled phrases and missing context, preventing a clear main event or subject.
A Well Laid Out Small House for A Narrow Lot
A detailed description outlines a compact six room residence with shower, comfortable living space for a typical family, a convenient kitchen, and an entry designed for easy access. Second floor offers three rooms with ample space, while exterior features include a newly painted roof and long frontage on a plat.
MENTIONED IN THIS ARTICLE
Drew York
ALT. Howe
Alwcus Sails
Veuy
Tina Thie Irtiay
Cuilar
Sam Eden
Property transfers and subdivisions across townships noted
Historic land records show multiple warranty deeds and subdivisions. Transfers involve Athens Township, Bern Township, Carthage, Canaan Township and Chauncey Corporation. Listings include lots, fractions, sections and tracts with varying acreages and consideration.
Corning School to Have Auditorium and Gymnasium
Corning plans a modern school building including a 75 seat auditorium and full gym, with girls’ rest room and class rooms. The project features new exterior brickwork, updated facilities, and surrounding grounds improvements, with details on parcels and warranty terms.
Logan reports over 864000 spent on city improvements since 1924
A Logan service director’s report to the city council details more than 864000 in expenditures since March 1924. The total covers street paving, street and sewer extensions, water lines, and other improvements including new lighting and fire equipment.
MENTIONED IN THIS ARTICLE
Logan
Sam
Edward Sherman
Howes
Orchard
Culver
Allroad
East Hunter
Santiace Eowara
IOGAN
Exposure hazards prompt protection of tree roots advice
An American Trust of Washington warning notes that exposing tree roots for five minutes can injure trees. It urges protective measures against sun dry air and wind, and mentions proper planting and care steps to prevent root damage.
MENTIONED IN THIS ARTICLE
Washington
New Seaman Residence Under Rapid Construction
Work progresses rapidly on the new home of W. Heanoat TL Stewart in Seaman. The two story frame house measures about 24 by 28 feet with a full basement for fuel and a heating room. A long porch fronts the Hayes street and a rear sunlit porch shapes the layout with a large living room and fireplace.
MENTIONED IN THIS ARTICLE
Ori
W.heanoat
Stewart
Seaman
Verena Tata
Hayes
Alumni Auditorium Nears Completion on University Campus
Construction of the Alumni Auditorium progressed with steel work finished last Saturday and roof decking imminent. The facade will rise to the main lobby soon, per Superintendent W. W. Turner, who oversees construction and masonry. The reinforced floor and slate roofing are upcoming.
MENTIONED IN THIS ARTICLE
Alumni
University
W. W. Turner
GS Veovis
Construction notes reveal rear dining area and built ins
The plan describes a large dining room off the kitchen behind the living room with many built in features. The lot on the lower side of Stewart street required loads of dirt for filling. Ab Seaman said he had to wheel dirt in a wheelbarrow to various sections to be filled.
MENTIONED IN THIS ARTICLE
Stewart Street
Seaman
Also Mentioned on This Page
Conpray
Middleport
Southern Ohio Electric Company
Thos Vial House
DIOG
Soeur
Clyde Edmunison
Athens Township
Norma WH
Lectin Gr
H. VA. Phillington
Ebner Anil’ Rose Td
Iagnon
Sniniivision
R.A. Laird
Graefian
Lara
Davis
Insloh
Bern Township
Amy J
Chauncey Corporation
J. J
Carthage
Loch J
Canaan
George G
Aero
Surfare
Tidgar
Tracy
Ceorge G. Gaul
Augustus
Steste
Grechtiel
Parlor Furnace
DeMolet
RAI Miller Lomberco
Pioneer Buieders
Hiddeeport
Ohio
Laei
Corning
Orning
Novi
Sia
Wnettan
Phisteriog
Kiehen
TD Trc
Speine Carles Taylor
Zanesville
Lee Towns
George St. Baker
L. Ve
Effie Lawson
UK Emera al Warner Avenue
Vine, View
Angle
Kertin Avenues
Goose Creek
Fourth
Front Street
Himter Street
Mulberry
Icanal
Glenova
Marni E. Nice
Mahle
Nice
Seasonville Civy Robert
Willian Dishon
Pearl
Addie Allman
Thaddeus Longatreth
York Township
A. Coal Company
FF. Boeckler
Riley Simpson
Apple Buildings
Wilam
Daisey Dishon
Builders Directory
Hocking Valley Shade CO
Athens Builders
State St
Athens Armature and Machine Works
Fem
Athens, Ohio
The
C. D. Heck Co
Athens Lumber Co
Glouster
Sic Tibes
Wihout
Tibet
Aenees
Wheaton
Mueller