Sewer Study Advances Relief Plan for Village Flooding
The main sewer would relieve overloads and divert storm water away from the treatment plant. Low eastern sections would benefit as the relief sewer channels floods from the current undersized mains. Proposals include sewers along Magnolia street and links to Yaleave, plus work in Ridge Park and south side sections. Of 2936 responses, 1627 reported basement or street flooding on July 12. Trustees will review the report at a special meeting next Tuesday.
MENTIONED IN THIS ARTICLE
Magnolia’ St
Brown
Chicago
Ridge Park
Kaspar
Ridge
Wilke
Salem
Highland
Chestnut
Village Zoners Open Door To New Apartment Project
Arlington Heights zoning approved a plan to build 24 to 32 units with an 18 unit project set for a March 17 hearing. A third sizeable apartment project rumors include two near Arlington High School and a State and Central roads site. Costs range 300 000 to 350 000 with no definite building locations shown.
MENTIONED IN THIS ARTICLE
Arlington Heights
Arlington High School
State and
Central Rds
Robert Pina
Salem
Edwin L. Johnson
W. Miner
Marcy
Franzen
Controversy Over Legion Fourth of July Carnival Site
Arlington Heights park board faces requests from American Legion Post 208 for permission to use Recreation park grounds for a July carnival. Neighbors fear noise traffic and yard disruption. park board previously banned fairs after 1953. Legion cites fundraising needs for fireworks and safety plans with police and volunteers. Village to reconsider after park board vote. sidewalk campaign planned on Euclid Avenue.
MENTIONED IN THIS ARTICLE
American Legion Post
Arlington Heights Park
The
Legion
Douglas Ave
Park Board
the Legion
Foundry Rd
Northwest Highway
Rhodes
Robert B. Bishop
Fremen
Bishop
Douglas Street
Vilage
Appoint First Village Engineer in Arlington Heights
A 29 year old Des Plaines civil engineer was hired as Arlington Heights first village engineer. Norman J Toberman, a 1949 IIT graduate, has run his own firm and served as a resident engineer with the Illinois Division of Highways. He will begin April 1 after a reserve duty hitch and earns 9060 annually.
MENTIONED IN THIS ARTICLE
Des Plaines
Arlington Heights
Norman J. Toberman
Oxford Rd
Illinois Institute of Technology
Toberman
Emnlavad
Nn Tall Nana
Dacien
Wivycu
Homer L. Chastine and Associates
Illinois Division of Highways
Elgin
Gineer
Air Force
Panama City
Fla
Also Mentioned on This Page
Jacobsen
Law Service
E. Davis
Clearbrook
Martini & Rossi
Mogen David
Quart Gid Thompson
Davis
Evergreen
Campbell
Arlington
Miner
Ludwig. C. Marcy
Barrington
Eee
Alem
Rolland
Salem Ave
Central
Lake Park Builders of
Palatine
State Rd
Central*rd
Meyer
S. Wilke Rd
Wengler
Kensington Rd
Dryden Pl
Robert H. Bukowski
Euclid Ave
Northwest Kwy
Wilke Rd
Heights
Timits
Dunton Court
N. J. Toberman
Consoer, Townsend, and Associates
Village Hall
Joseph G.lohr
W. Miner Sr
Louis Miller
Miller
Arlington’ Heights
AF & AM
Masonic Temple
Plum Grove Ave
Palatine, Illinois
Russell R. Robertson
W. My
Chestnut Ave
George L. Pflingston
Pecs
S. Evergreen
Ray Wilke
N. Haddow Ave
Arlington’ ‘Heights
For All
Rexall Drug
W. Campbell
Owiaaaaae Martin-Senour
INCE
DIAG
Olympic
Huff Sound System
Landwear