Springfield Leader district listing and rates 1945
The Springfield Leader notes publication in St James Manitoba with Alfred W. Hanks as publisher. District reps include Lac du Bonnet Mrs Cuff Brown and Mr J W Wade, Seven Sisters Falls Mrs M Everson, Great Falls Miss Betty Jean Thorbergson, Bissett Mrs J Wegle, Whitermouth Ed Malkoske. Published October 2 1945.
MENTIONED IN THIS ARTICLE
Springfield Leader
St. James
Lac du Bonnet
Cuff Brown
J. W. Wade
Seven Sisters Falls
M. Everson
Great Falls
Betty Jean Thorbergson
Bissett
J. Wegle
Whitermouth
Malkoske
First Edition of The Springfield Leader Heralds a Community Paper
A publisher reflects on the first edition of The Springfield Leader as a valued weekly bringing news to the district. Gratitude is extended to district representatives and Manitoban supporters, noting the paper’s roots in other Leaders and its aim to be integral to community life “Of The People, For The People, And By The People.”
MENTIONED IN THIS ARTICLE
Springfield Leader
Springfield
St. James
Morrisburg
Ontario
London
Britain
Wholesale Textile Association
Parish Notices for Lac du Bonnet District
October 5 to 7 schedule includes Mass benediction evening prayer and special high mass with catechism and retreat from October 21 to 28 1945 led by Rev Father P Amedee O F M. Anglican services at St Johns Lac du Bonnet and St Marys Pointe du Bois with Sunday School and Young People's Club also listed under Rev E K Bissell.
MENTIONED IN THIS ARTICLE
Saint Gerard
Great Falls
Lac du Bonnet
Father P
St. John’s Anglican Church
Young People’s Club
St. Mary's Anglican Church
Pointe du Bois
E. K. Bissell
Manitoba Farm Electrification Plan Expands Winnipeg River Power
Manitoba plans extensive farm electrification to boost farming. A survey covers 42 municipalities while seven districts test farm lines. Over 660 farms will gain service this year, plus 200 towns and villages. The Manitoba Power Commission aims for 40 towns and 5,000 farms yearly as material and labor permit. Capital needs exceed 3.5 million dollars with over two million man hours required. Water power from the Winnipeg River underpins urban growth and farm economics, making farming more attractive and shifting it toward modernization.
MENTIONED IN THIS ARTICLE
Commission
Winnipeg River
Manitoba
Manitoba Power Commission
Winnipeg Electric Power Plants Opened on Winnipeg River
Manitoba Free Press reports a pivotal 1906 phase in Winnipeg industrial growth as the Winnipeg Electric Company brings hydro power to the city. The Pinawa plant starts Canada’s first hydro plant in the region, cutting electricity costs from 20 cents to 3.3 cents for lighting and 1 cent for cooking, with ongoing operation and further river-based plants expanding western hydro infrastructure.
MENTIONED IN THIS ARTICLE
Winnipeg Electric Power
Winnipeg River
Western
Canada
Manitoba Free Press
Greater
Winnipeg
Pinawa
Western Canada's Pioneer Hydro Plant at Pinawa Delivers Power
Winnipeg Electric Company announces first hydro electric power delivery from Pinawa plant part of a three plant system including Seven Sisters and Great Falls. Pinawa capacity 30 000 horsepower with nine generators. Great Falls plant capacity 168 000 horsepower and six generators. Dam head 56 feet. Workers gained employment during construction. Plant aims to balance price cuts with transmission cost uncertainties.
MENTIONED IN THIS ARTICLE
Winnipeg
Western Canada
Pinawa
Seven Sisters
Great Falls
Canada
Pioneer
Winnipeg Electric Company
Manitoba Hydroelectric Plant Opens After War Growth
The 1931 dam project produced over 2,000,000 man days of work for Canadian wage earners and now offers 112,500 horsepower with potential to 225,000 under full development. Water behind the dam stands at 38 feet and may reach 66 feet. Winnipeg Electric Company power output rose 43 percent from 1940 to 1944, from 699,471,066 to 1,004,933,137 kilowatt hours, with rural electrification driving ongoing demand for hydro power.
MENTIONED IN THIS ARTICLE
J. D. McGregor
Winnipeg Electric Company
Winnipeg
Canada
Manitoba Power Commission
Manitoba
Aluminium Houses Spring Up In Britain
The first pre fabricated aluminium houses have appeared in Bristol England. They were erected in about three and a half hours.
MENTIONED IN THIS ARTICLE
Britain
London
Bristol
England
Also Mentioned on This Page
The
Notre Dame Parish
Amedee
O.F.M
Father L. Lahaie
Winnipeg Electric) Company
American Hide & Fur Co
Rupert
Man
A. McIntosh
Pontiac
A. Byman
Leader
Leader Bldg
Mrs. C. Brown