Ice arena pipe leaks drive costly rodeo repair plan
Leaks in the concrete arena floor caused by patching work on the ice plant led to a repair bill over 4700 dollars with most costs from local suppliers. Cimco found brine and pipe damage and urged reinforcing concrete and replacing sections of rink pipe to prevent future failures.
MENTIONED IN THIS ARTICLE
Cimco
Rink Board
South Perimeter Board
Arena
Rodeo Committee
Boge and
Boge
Winnipeg
Rink
Vern Rosnoski
Rosnoski
Also Mentioned on This Page
Russell Area
Stor
Weathertec
WeatherTec Services Inc
Rodeo
Richard Witty
Arena Board
Woomer At
Enyo
Redeemad
Ates
Caisses Populaires
Trust Cotine Bear Gander Thesia
Manitoba