Hit or Miss Editorial on Truth and Work Ethic
An editorial observes that no man pleases all and mocks self serving critics. It jokes about editors overeating, advises young men in courtship, and argues necessity drives invention versus idleness. It toys with caricatures of critics and muses on Edenic fruit versus bananas.
MENTIONED IN THIS ARTICLE
Wannaman
Calumet Canal progress and capacity plans for Calumet Sag Channel
The Sanitary District of Chicago reports preliminary work on the Calumet Sag Channel with the Illinois and Michigan feeder widened to aid drainage. Topographical surveys map the route to the Calumet River for a channel linking to the main system. Construction may start next spring once right of way is secured, at an estimated cost of 1 8 36 500 000, capable of 2000 cubic feet per second, rising to 4000 if the injunction is dissolved. Currently 8000 cfs is drawn via the Chicago and North Shore routes, and 10000 cfs limit would be removed when completed, negating sewage discharge into Lake Michigan.
MENTIONED IN THIS ARTICLE
Calumet Sag
Sanitary District of
Chicago
Illinois and Michigan
Calumet River
Day Bridge
Sanitary District
Lake Michigan
Carcago River
North Shore
Also Mentioned on This Page
Garden of Eden
Adam
University of Copenhagen
MAU
Wm. May & Co
Riverdale
Leyden Avenue
Wisconsin
Gelment
Dolton
C. E. Cook
Dolton Yards
Bell System
Bell
Chicago Telephone Company
Washington Street
the Dem
Calumet Canal
Obeldobel
L F Kipley
Obeldobel & Kipley
The
Calumet Hotel
137Th Street
F. L. Logan
Lincoln Ave
Jennie C. Dolton
Wilmer Bonse
Oxford Market and Grocery
Chicago Steel
West 137Th St
Air
G. Peper
Ala
Henry W. Schnoor
Chicago Street