Million Dollar Plan For City Water Plant Is Submitted
Norwalk plans to expand its water filtration system with two options from Richland Engineering. A short term upgrade would raise capacity from 3 to 4 million gallons daily at about 60 thousand dollars. A long term expansion could cost about 1.139 million dollars and require up to 142 months to build.
MENTIONED IN THIS ARTICLE
Norwalk
Richland Engineering Co
Mansfield
Water Committee
Wayne Goodsite
Goodsite
Richland Engineering
George Cunitz
Charles Sweet
Pilot Escapes In Crash At Huron Airport
Fremont man Russell W. Brown 38 escaped injury when his 1961 Piper landed and ran off the runway at Huron Airport. The aircraft tore down 35 feet of state fence and flipped over leaving moderate damage. A car and truck collided on Walnut Road east of Willard.
MENTIONED IN THIS ARTICLE
Fremont
Huron
Piper
Russell W. Brown
State of
Ohio
Walnut Road
Willard
Small Engine Mechanics Course Begins at EHOVE
A small engine course for lawn mowers and small tractors starts July 26 at EHOVE Joint Vocational School. Registration is by phone 8:30 am to 4 pm from Sandusky or Milan or by enrolling at the school.
MENTIONED IN THIS ARTICLE
Ehove
Sandusky
Milan
Also Mentioned on This Page
E. Main
Seim
Sandles
RED Goose
W. Main St
Pete
West Main ST
General Electric
Use Perfected
Zero
Freezer
Rattlamber
Srree
Howe
Noke Howe