TVA builds 7,500 KB Substation for Joe Wheeler Co op
TVA installed a 7,500 KVA substation in PRICEVILLE to supply the Joe Wheeler Electric Membership Corporation. The facility ties into TVA’s 46,000 volt system via a six mile link to the Decatur Huntsville line at an estimated cost. Member power use surged from about 2,850 to 8,900 KWH annually over the past decade, while membership grew 35 percent to 14,220 and revenue rose about 170 percent to over $1.6 million.