Elevated I-55 roads bring swamp savings and safety
Louisiana aims to ease swamp traffic with completed I-55 elevated spans, first built in 1935. The 211 miles under way cost about 320 million dollars in total, using 120 foot pilings driven 100 feet deep to raise roadways above marshland.