Bristol considers 14 million sewer expansion plan
Engineering firm Metcalf and Eddy outlines a 14 220 000 sewer system expansion dividing Bristol into five districts Northwest Silver Creek East Shore Mt Hope Bay and Griswold Ave with substantial sub projects and costs totaling 11 040 000 while the town seeks state health department approval and a 30 day extension from the Housing and Federal Dept a session with department heads is planned for Dec 27 and a separate unpaid gasoline tax bill of 852.87 is advised for budget consideration
MENTIONED IN THIS ARTICLE
Housing and Federal Dept
Sewer Board
Bristol Sewer Commission
Metcalf & Eddy, Inc
Silver Creek
East Shore
Mt. Hope Bay
Griswold Ave
Naomi St
A. Southworth Ave
Harrison St
Mt. Hope
Tower St
Griswold Avenue
A. Griswold Ave
B. Church Cove
Bristol Builders Assoc
Bristol
Henry Pacheco
Open House at YMCA Pool Showcases New Facility
The public is invited to tour the new YMCA swimming pool this Sunday from 2 to 4 pm, following a successful fundraising drive. A Saturday showing for donors is set 2 to 4 pm. Phase Two plans include a 40 car lot, sauna additions, and remodeling of the old post office for an adult lounge.
MENTIONED IN THIS ARTICLE
YMCA
George A Jenkins
Gron
Court St
YMCA Announces Historic Holiday Pool Schedule
The YMCA releases its first ever holiday pool timetable covering December 24, 26 27 28 30 and 31, with sessions from 10 am to noon 2 pm to 4 pm and 7 pm to 9 pm except for December 24 and 31 when closing time is 4 pm.
MENTIONED IN THIS ARTICLE
Jenkins
The
Phoenix
YMCA
Bristol Phoenix Announces Christmas Week Publication Schedule
The Bristol Phoenix will publish next week on Tuesday before Christmas. Deadline for news and ads is 2 p.m. on Monday.
MENTIONED IN THIS ARTICLE
Bristol Phoenix
Recommendations for Bristol sewer system upgrades and financing
A set of engineer recommendations urges immediate construction of the Fox Hill Interceptor and Creek Street Pump Station to relieve inadequate sewerage and extend service townwide. It calls for removing street inlet connections, creating separate storm drains, adding interceptors, a sludge dewatering facility, grit chamber upgrades, a Parshall flume, modernized electricals, no land sales at the treatment plant, and staged phasing with varied financing including grants, bonds, betterments, and user charges.
MENTIONED IN THIS ARTICLE
Fox Hill
Creek Street
Bristol
Force Main
East Shore