Weekly Advertiser Ad Offers Tillers Homes and Trailers
Weekly Advertiser lists services from Joe Emree heavy duty tiller to rototilling and towing. It promotes two bedroom homes near school with water mains and gas, and a trade for an American mobile home 8 by 41 with oil heat. Classifieds include a 1953 Ford 2 ton pickup for sale at cash.
MENTIONED IN THIS ARTICLE
Joe Embree
Chetwynd Shoe Repair & Trading Post
Chetwynd
FORD
Alterations Planned for Chetwynd Hotel Expansion
George A Killick of Dawson Creek leads the Chetwynd Hotel alterations with work set to start within ten days. A 30 room west wing extension is deferred to a later phase. Changes cover restaurant and kitchen, washrooms, ladies beverage room, lobby, and extra space for a Royal Bank of Canada branch. Local subtrades and labor will carry out the project.
MENTIONED IN THIS ARTICLE
George A. Killick
MAAIC
Dawson Creek
Chetwynd
Royal Bank of Canada
Bear Mistakes Airplane Air Scoop Grill For Honeycomb
Gary Moore found the air scoop ripped from his engine and other damage after a yearling bear tore at the grill mistaking its honey comb-like appearance for a meal. No honey found. travel to Hudson Hope delayed for Gary and Billy Robertson who rode trucks around the route.
MENTIONED IN THIS ARTICLE
Gary Moore
Billy Robertson
Hudson Hope
Gary
Jack Carlsone
Oral Polio Vaccine Now Available To All
The new oral vaccine is made available to all who want it. Schedule of clinics appears on page 4. Questions answer what it is and who should take it. It is pleasant tasting and easy to take in a few drops of water. It should be taken by everyone from young to old even if previously treated with another vaccine. cont'd pg. 2
Reservoir floor and footings on rock discovered
While excavating the reservoir on the beach north of town rock was found in the last few feet. The shale formation was removed by a DY Cat and will form an excellent base for floor and walls. The view from the site is exceptional.
MENTIONED IN THIS ARTICLE
Town
Ferry Cable Tower Work Underway Near Hudson Hope
Construction crews building the ferry cable tower near Hudson Hope traveled via Chetwynd on Tuesday and planned to start at the site on Wednesday with completion expected after two weeks. The ferry would likely be out of operation until June 7th at the earliest.
MENTIONED IN THIS ARTICLE
Hudson Hope H
Chetwynd
Toda
Also Mentioned on This Page
Chetwynd Business Service
Wm. E. Gardiner
Canada
Bear
Stirling
Gizeh
Bev
Nels
Edmonton
Calgary
Crows Nest Pass
Nelson
Prince George