Engineering plan outlines concrete flume and dike route
Warren Borough engineers propose a concrete flume extending 681 feet along Pennsylvania Ave from point seven to a heavy circle. The project continues 3,460.5 feet north along Grade two with an earthen dike and rip rap. Total new construction equals 4141.5 feet.
MENTIONED IN THIS ARTICLE
Warren Borough
Pennsylvania Ave
United Refining Co
Warren council approves Glade Run flood control project plan
Warren borough council unanimously approved an ordinance condemning property for the Glade Run flood control project and arranged for right of way transfers with Grade Two. The project includes 685 feet of reinforced concrete channel and 3 340 feet of earthen levees with about four-fifths of a mile of stream to be improved.
MENTIONED IN THIS ARTICLE
Warren
Glade 1
Thomas A. Mekis
Valencia
Harper
United Refinery
New York Central Railroad
Beech St
Charlevoix Place
Liberty
Second St
DeBell
Jaycees
Public Opinion Sparks Discussion Across Sections
A string of brief column titles hints at mixed reader responses and features. Items mention scholarships totaling 18 515 dollars and debates over radio ratings while noting labeled opinions from Crosby and Childs across outdoors and asides.
Also Mentioned on This Page
Glade Run
Warren County
Freeson
Vania
Europe
Crosby
STEEL