Glade Run Flood Control Project Aerial View
An Everett Stoke aerial shows the Glade Run flood control work covering 4100 feet with a 700 foot concrete flume. Walls are 35 to 40 percent complete near Locust street while an earthen dike with rip rap will follow. Low bid was 185775 funded largely by the state. Foreground shows United Refining Co and Nelson and Ellberg's gravel pit.
MENTIONED IN THIS ARTICLE
Everett Stoke
Glade Run
Glade Township
Pennsylvania
Locust St
Park St
United Refining Co
Nelson & Ellberg
New Cheaper Sewage Plant Featured This Issue
In Observations the piece outlines a proposed lower cost sewage plant, detailing design changes and anticipated savings. Lippman discusses containment measures for Castro in a separate column. Outdoors covers unusual bear behavior, while Play Time previews The Fear Makers. Ranger notes soil appreciation gaps, Robb flags negligent parenting in Best Families, White weighs Kennedy or Johnson, Crosby analyzes controversy around cornflakes, and TV This Week surveys Democrat politics.
MENTIONED IN THIS ARTICLE
Castro
Lippman
Ranger
Robb
Kennedy
Johnson
White
Crosby