Crosswalk dispute grows as Windsor Point Park work continues
Neighbors press for a direct crosswalk to Windsor Point Park at Francisco and Schooner drives. DOT says no new crosswalk due to lack of pedestrian accidents and current all way stop controls. Residents urge signalization, repainting, ADA ramps, and safety measures to slow traffic before the fall park completion.
MENTIONED IN THIS ARTICLE
Windsor Point Park
Department of Transportation
Francisco
Schooner Drives
Lake Forest
Marina Village Middle School
Schooner Drive
Heidi Hannaman
Hannaman
el Dorado Hills
el Dorado Hills Boulevard
Jackson
District 1
Ron Mikulako
DOT
Darryl Brown
Lake Forest Owner Association
Ray Myers
Waterford
Francisco Drive
Marina Village
Myers
LFOA
Brown
Transportation Capital Improvement Project
CIP
Transportation Division
ADA
Gina Johnston
Village Life
Julie Samrick
El Dorado Hills Fire seeks options for selling Quint fire engine
The El Dorado Hills Fire Department plans to auction a Marian built Quint engine valued at 100000 to 150000 after a few contingencies. The department bought the truck new for 625000, with a history of minor repairs and noted dual water storage and pumping capabilities.
MENTIONED IN THIS ARTICLE
el Dorado Hills
Roberts
Marian
Fire Department Replaces Ladder Truck with Sutphen 100-Foot Platform
The department bought a $1 million replacement in February, a 2012 Sutphen 100-foot platform. Sutphen, a century-old fire apparatus maker, offers off the shelf models. The fleet includes three Type III engines for wildland calls and medical aid, five Type I engines for structure fires and other emergencies, a multi purpose Quint, an Air unit for SCBA rehab, and a Governor's Office water tender for non hydrant areas and wildland use.
MENTIONED IN THIS ARTICLE
Sutphen
Roberts
Governor's Office of Emergency Services
Sienna Ridge Plans Residential Lots at J5 and 16
Sienna Ridge envisions more than 100 homes at the J5 and 16 site with some lots backing Bridlewood Canyon. Construction could start in 2014 though no builders are chosen, and a Village 15 shopping center may be added at the new southeast intersection if market conditions allow.
MENTIONED IN THIS ARTICLE
Bone
Bridlewood Canyon
Shopping center plans shift for Marble Valley area
Howard Bone says a Bass Lake Road and Highway 50 center to serve Marble Valley would lead to abandoning the J5 project. Construction will run through summer and fall, with road opening expected in November or December depending on weather.
MENTIONED IN THIS ARTICLE
Howard Bone
Bass Lake Road
Highway 50
Marble Valley
Also Mentioned on This Page
Johnston
Mikulako
Parker Development
Sienna Ridge Road
Sienna Ridge
Wayne K. Tsutsuse
DDS
USC School of Dentistry
Latrobe E Ra
Business Park
Dorado Hills
Ife
Part of
The
McNaughton Newspaper Group
Richard B
Espositore
Accounting Manager Office
Wells Fargo Bank
Town Center
Dr. Ste
Flowers de Amour
Holiday Inn Express
Town Center Dr
Remax
Yogaberry
Mansour
Town Center Dr. Ste
Valero Gas Station
Post Street
Chevron Gas Station
Suds Car
Wasi
Valley View
Lassen Lane
Graphecs
Lettyog
Ntdemocrat