High School Architecture Compared Across Districts
Five district high schools share a comparative study with Catalina High in District 1 noted for higher costs and two story design. Palo Verde High costs 2493 per student with a newer build. Westwood Mesa is largely concrete one story at 1496 per student. Flowing Wells is a single story reinforced concrete frame with no internal corridors at 1021 per student. Sunnyside is one story with central corridors at 1534 per student.
MENTIONED IN THIS ARTICLE
Catalina High
Palo Verde High
Mesa
Westwood High
Wells High
Sunnyside High
Palo Verde
Burglary Ring Suspected In East Side Thefts
Police suspect a gang carried out two night burglaries on the East Side at Pittsburgh Plate Glass Co and Ryan-Evans Drug Store. Thieves pried open safes with crowbars, took about 100 dollars in petty cash and 600 dollars in checks plus 300 to 400 dollars of equipment from the glass firm, and stole narcotics and cash from the Swan Way Plaza drug store. Entry was gained via rear windows and doors, with safes moved through warehouses.
Children Hospitalized After School Lunch Tainted Meat
Cagliari authorities say 30 kindergarten children were hospitalized after eating tainted canned meat at a school lunch. Some are reported in serious condition.
MENTIONED IN THIS ARTICLE
Cagliari
Sardinia
UPI
Liquor License Transfer Fight Heads to Superior Court
Tavern operator Don Thompson seeks to transfer Pueblo Hotel and Apartments license to Walt's Silver Spoon Tavern at 673 E Plumer Ave. A Superior Court hearing set for 9:30 a.m. next Friday. The city opposes, citing zoning rules on on site liquor.
MENTIONED IN THIS ARTICLE
Don Thompson
Superior Court
Walt's
Silver Spoon Tavern
Plumer Ave
Thompson
W. T. Holmes
John A. Duncan
State Superintendent of Liquor Licenses and Control
Pueblo Hotel and Apartments
S. 6Th Ave
Plumer Avenue
Hag
Catalina High School Costs Compared With Rincon Study
The article compares high school construction costs, noting Catalina built in 1957 with air conditioning, gym, and auditorium costs about 11.76 per square foot for 130 sq ft per student while Rincon built in 1958 with 167.8 sq ft per student at 13.60 per sq ft. Flowing Wells is the least expensive at 12.24 per sq ft.
MENTIONED IN THIS ARTICLE
Amphitheater High
Tucson
Flowing Wells High
Sunnyside High
Pueblo High
Auditoriuu
Catalina
Rincon
Soviet bloc tensions cloud call for Communist unity
Wu, the Beijing representative, criticizes inner communist polemics while urging a summit with Khrushchev. East German officials back coexistence with the West as Moscow decries public quarrels among allies. Wu asserts China will oppose imperialist doctrines and continue the struggle against reformist ideas.
MENTIONED IN THIS ARTICLE
Matein
Communist World Movement
Otto Winter
Khrushchev
East Berlin
Wuw
Moscow
Red China
China
Also Mentioned on This Page
East Side
Pittsburgh
Mts
Kelvinator Thermador
Packard-Bell
RCA Ae
TG Gibson
Easptticometenema
FE. Speedway
Fuller Paint
Ucson
United States
TOTAL
Stone Avenue
Congress Street
Midtown
St Street of Alvernon Way
Member
Fencam
Deposit Insurance Corporation
Hollywood
RSF
Sxéed Zee
U.S
North Stone
Arizona
Warnes Facturing
Cai
DIST
Sunnyside
Catalina High School
Nikita