Mt Dora Franchises Florida Public Service Company Text
Franchise contract details electric service terms for Mt Dora including 30 year grant period, rate schedules per KWH, trees trimming under town supervision, and meters, with payment terms and motor charges. Includes land grant option at expiry and arbitration for plant purchase.
MENTIONED IN THIS ARTICLE
Mt. Dora
Privand
Florida Public Service Company
Florida Public Co Company
Mt. Doral
Park Commission
RATE: Power and energy charges for electrical service schedule
The document details a tiered Demand Charge and Energy Charge structure for electric service. It defines maximum demand calculations, horsepower to kilowatt conversions, diverse load factors, and percent-based adjustments, plus minimum charges, payment terms, transformer requirements, power factor penalties, and conditions for alternative power and secondary metering agreements.
Street Lighting Service Schedule N Five Year Contract
First 200 K W H per month at .07 per K W H Next 200 K W H per month at .06 per K W H Next 600 K W H per month at .05 per K W H Next 1000 K W H per month at .04 per K W H Excess of 2000 K W H per month at .03 per K W H MINIMUM The minimum charge is $1.00 per P per month of connected pad and is made only in case the charge for every consumed in any one month shall be less than the minimum charge for the installation, and, in this case, no charge will be made for the energy consumed. Bills under this schedule are due and payable within ten days of date of bill, net.
Lamp Schedule Terms and Payment Provisions
The text outlines lamp specifications and commercial rating for lamps to be furnished, energy supply during lighting hours constituting contract fulfillment, and monthly billing at one twelfth of the annual rate with ten days payment. It states the company will furnish all lamps used under this schedule.
Schedule 0 Street Lighting Service Five Year Contract
This item details a municipal street lighting contract for a five year term. It covers lamp counts from 40 to 400 CP with annual charges per lamp and line charges per mile, conditions on capacity, fault outages, and municipal rights of way. The document notes outages are deducted from monthly payments if lamps are out beyond twenty four hours, with adjustments for timely repairs.
Meter Rate Wholesale Water Service Agreement
The contract defines secondary meter yearly rates for various service characteristics. It specifies installation conditions under which standard alternating current service applies and sets a method for calculating electricity charges for lighting and power. It notes that lighting demand not exceed 20 percent of total demand and that the company does not guarantee voltage regulation for mixed service.
MENTIONED IN THIS ARTICLE
Comay
Rates for Lamps and Installations in Municipal Contract
The schedule sets unit prices for 100 C P Lamps at 30.00, 250 C P Lamps at 48.00 each, 400 C P Lamps at 65.00 per unit, and 600 C P Lamps at 90.00. Rates apply only to installations above a total capacity threshold. lamps must be spaced no more than 400 ft apart. the Municipality must report lights-out performance to the Company, which will deduct charges accordingly.
MENTIONED IN THIS ARTICLE
C. P
Schedule of Lamps and Outage Provisions
The text outlines annual allowances for lamp outages and lighting hours, stating no deduction for outages unless not repaired within twenty four hours after municipality reports. It defines candle power requirements and monthly rendering of a report for lamps under this schedule.
White Way Lighting Service Five Year Contract Schedule P
Municipal White Way Lighting uses the companys constant current street lighting service as per standard practice and regulations of the Company.
Lamps and posts contract under street light schedule
Under the street light schedule the company furnishes 4000 hours yearly of lamps with posts spaced up to 100 ft and minimum 250 CP lamps. Rates given per lamp per year vary by lamp type. Municipalities may direct additional posts but not within three months of contract expiry. Continued on page 9.
Also Mentioned on This Page
K. W
P” White Way Lighting Service
J. W. Hunter
Tavares, Florida
Emory J. Close
Tavares, Fla
Thomas J. Cooley
Mount Dera
Florida
Trade
Lake County Enterprises
Lake County
Board of County Commissioners