Aging South Laguna sewer tunnel highlighted in tour
The 2 mile gravity sewer tunnel built in 1954 under South Laguna was described as a marvel that eliminates lift stations. Repairs in 2007 and ongoing maintenance aim to prevent cave ins and spills as about 1 million gallons of wastewater daily flow toward the Coastal Treatment Plant in Aliso.
MENTIONED IN THIS ARTICLE
South
Laguna
Capistrano Beach
Alan Warzyca
South Coast Water District
Warzyca
South Laguna
North
Dana Point
Aliso
New tunnel project to replace pipe for 100 years
The district plans a major tunnel with about 10 000 feet of pipeline and a new at least 8 foot diameter pipe. Staging areas will be set at Thousand Steps Beach and nearby sites for about a year each. Bond funds will cover costs with revenue and state loans affecting possible rate changes.
MENTIONED IN THIS ARTICLE
Thousand Steps Beach
Camel Point Beach
Aliso Beach
Fourth Avenue
Coast Highway
Joe McDivitt
McDivitt
Also Mentioned on This Page
Scnd.org
Jclay
Ocregister.com
Bruce Hazelton
Orange County Register
Laguna Beach
Laguna Niguel
Dana’ Point
San Juan E Paraano
Table Rock Beach
Varie
Keene Ana and
Source
Brian Moore
The
of Jesus Christ
Park Ave
Church of Jesus Christ of Latter-Day Saints
Ann
sixrich@gmail
Gmail
City of David
Christ the Lord
le Ray al Pea
Ryan el
Ms Beers
SDA SL
ADT
Aelia