Memorial Plaza Plan Changes Add Office Buildings
The war memorial commission with architects F. R. Walker and C. W. Stedman of Cleveland Ohio decided to add one or more office buildings to house patriotic societies. The principal memorial features remain, offices to be placed on the Plaza with matching exterior. Plans due for board review in early September and a full-area model to be shown to the public in fall. Construction of the offices likely to begin soon after approval.
MENTIONED IN THIS ARTICLE
State War Memorial
War Memorial Commission
F. R. Walker
C. W. Stedman
Cleveland
Monument plans advance with cost saving offices
Marcus Conning, board president, says plans proceed and by spring work on the monument should begin. He adds that building separate office space will cut costs by allowing elimination of large interior features.
MENTIONED IN THIS ARTICLE
Marcus §.Conning
Road paving set to close gap on State Road No. 1
The State highway commission announced pavement will cover the gap in State Road No. 1 through Carmel within weeks. Chief engineer C. Gray instructed the contractor to proceed so the direct hard-surface link between Indianapolis and Kokomo is finished this fall.
MENTIONED IN THIS ARTICLE
Carmel
State Highway Commission
C. Gray
Commission
Indianapolis
Kokomo
Also Mentioned on This Page
Memorial Plaza
Indianapolis-Kokomo Highway
Heidi Dickie
Hook Drug Company
Haag Drug Company
Oxford
Cale
Strap
A. Gubin
W. Wash St
Rubens Big
Rubens
West Washington St
Deliveri Ny Suite
Philadelphia
Cincinnati
St Lous
Wy Pex