Graettinger Opera House to be built at center of lot
Graettinger Opera House Company shareholders meet in Harrison hall elect directors H G Harrison C B George T C Fockner P J Paulsen Oscar Craven E J Mitchell John Graettinger decide to build a 40 by 80 foot hall in the center of thrash lot west of the Khusle blacksmith shop to maximize light and ventilation Directors elect L E Teckner as president B J Mitchell as vice president O G George as secretary and John Graettinger as treasurer Subscribed stock totals 6240 dollars with plans to raise up to 7000 dollars to begin construction
MENTIONED IN THIS ARTICLE
Graettinger Opera House
Harrison Hall
H. G. Harrison
L. E E. Teckner
B. J. Mitchell
O. & George
John Graattinger
Bhott
Sim
Graettinger Tile Works Modernizes Plant With Steam Cure System
The Graettinger Tile Works expanded and modernized its facility by installing a steam curing system, adding twenty curing rooms, a new sand storage, a twenty-horsepower engine, a bell conveyor, and upgraded equipment to improve tile quality and production. The plant, one of the best equipped in the country, now emphasizes efficiency and capacity.
MENTIONED IN THIS ARTICLE
Graettinger
Jan Inkan
Expante
Tun
Mhisé
Also Mentioned on This Page
Oxfords
Co-Operative Coo
Milans
Opera
Granttinger Tile Works
Emmetsburg, Fa
S. E. McMahor
Algona
Emmietsburg
Rel