Pine Valley Coal project advances toward trial cargo
The Pine Valley Coal mine plans a trial shipment of 100000 tonnes of thermal coal to Japan, with a long term contract possible if buyers accept. Inspectors say the coal will be hauled via track through Willow Creek forest road to a loading facility, with sediment control and dust monitoring in place and monitoring results sent to Prince George.
MENTIONED IN THIS ARTICLE
Pine Valley
Japan
Dave Morgan
BC Railroad
Morgan
Willow Creek
Ministry of Environment,Lands and Parks
Prince George
Dave Fawcett
Pine Valley Coal Project
Pine Valley Coal Public Advisory Committee
Fawcett
Fingerprint Clinic Promotes Child Safety in Crime Prevention Week
The Chetwynd Women's Resource Centre hosted a fingerprinting clinic at Chetwynd Public Library during Crime Prevention Week. Parents had 90 sets of fingerprints taken for child identification, kept by parents for use if a child goes missing.
MENTIONED IN THIS ARTICLE
Gloria Clark
Chetwynd
Cindy
Dennis Garvey
Cindy Garvey
Ina Roland
Garveys
Westcoast plans Grizzy Extension and Kween plant proposal
Westcoast Energy proposes a Grizzy Extension pipeline and a Kween gas plant to optimize gas output with reduced emissions. Public meetings drew 25 residents in Chetwynd and 120 in Tumbler Ridge as Doug Thornycroft outlined plans and schedules for 2001 construction and job creation. The Kween plant will capture carbon dioxide and sulfur dioxide and re inject wastes into nearby depleted wells. The plant will be hydro powered with minimal particulate emissions, while Pine River plants would emit 15 tonnes of sulfur dioxide daily. Ministry confirmation noted.
MENTIONED IN THIS ARTICLE
Kween Gas
Tumbler Ridge
Doug Thornycroft
Westcoast
Kween
Pine River
Rich Girard
Ministry of Environment, Lands and Parks
Also Mentioned on This Page
Lynda Lafleur
Westcoast Energy
Pauline Laidman
Subway