Snowy River Hydro-Electric Scheme Studied for Sydney Railways
A long survey by Rendel, Palmer and Tritton outlines the Snowy River Hydro Electric Scheme as the preferred path to meet rising Sydney power demand and railway electrification. It details two power stations near Biddie Point delivering up to 220 000 kW, with transmission to Sydney and Burrinjuck Port Kembla and a 10 600 000 pounds total cost, to be built in stages over ten years. The report compares this with extending steam plants and suggests a Central Electricity Authority to coordinate generation and transmission across the state.
MENTIONED IN THIS ARTICLE
Rendel
Palmer and Tritton
London
Sydney
Snowy River
Jindabyne
Biddi Point
Snowy
Goulburn
Burrinjuck
Port Kembla
Cooma
Newcastle
Lithgow
Nowra
Styx-Georges Creek
Wyangala
Nymboida
Tamworth
Lismore
Central Electricity Authority
Sydney Central
A. Raworth
Southern Railways
England
Bunnernng
White Bay
Bunnerang Station
White Bay Station
Shoalhaven
Biddie Point
No. 2
No. 1
Dalgety
Department of Works and Local Government
Department of Railways
Water Conservation and Irrigation Commisson
Also Mentioned on This Page
Ae (Inc
Australia
B.al.m. Paints
Dulux Enamels
Australian Fertilizers Ltd
International Harvester CO. Ltd
Armstrong-Holland
Cyclone
Buzacott
Hardie
Castrol, Shell
Vacuum Oil Co
Bagley
Paton's
Baldwin
Haraw
Bombala
Ornous
SAO Biscuits
Arnott
Tour F.cey
Ih. Allen
Hotel Bombala
Reg. Kerr
Bombala 15
Railways
Hormsby
Parramatta
Liverpool
Suther
Hydro-Electric
Sydney and District
Port Kenrbla
Cooma Express
Howe
Assinio
Hoffieldt
Olite” Aisbestos
H&terior
Saneeh Nanos
Pry
Hardies
E. R. Leonard & Son, Bombals
Permewan Wright Limited
Pontiac
Heldes
Loogeys
Bombala Motors
Hayes & Brown
Winchcombe, Carson Ltd
LJ Just Ag
Combe
Carson
Winchcombe, Carson, Ltd
Winchcombe House
Bridge St
Commonwealth Savings Bank of Australia