Water flood project eyed in Humble area this year
Plans outline cost and infrastructure for a water flood to stimulate oil production. The injection system will use 42 000 barrels of water at 2250 pounds per square inch to flood Queen and Nolley sand pools. Start date targeted for fall with authorization pending and cooperation from Keen Sandpool operators.