Anaconda Big Smelting Plant Under Rapid Construction
All hands work on Amalgamated’s new copper smelting plant at Anaconda as steel arrives daily and the mammoth steel frame outlines rise. Rail freight yards near capacity reveal miles of new track and a growing construction zone. The plant aims for unmatched daily output and stands as a model of modern copper industry construction.
MENTIONED IN THIS ARTICLE
Anaconda
Plant conflict shields old system as new unit rises
In the flaws of Amalgamated’s management two plants will operate and divide the Butte mines output suited to their capacities, preserving the stand-off as the old plant is replaced by the new.
MENTIONED IN THIS ARTICLE
Amalgamated Company
Butte
Buildings Near Plant to Include Height Measurements
The report outlines future structures around the plant with heights given in feet and inches for several buildings. Details indicate planned development and integration with existing facilities.
Vast Smelting Plant Arises Above Anaconda Hillside
In Anaconda the Amalgamated Copper project breaks ground on a massive new smelting complex. Ground was broken last June and progress to finish before winter aims to house a complete plant with a 616 by 43 foot Slant concentrator, roaster, converter, blast furnace and reverberatory, all built of steel and stone. The site shows rail spurs, hundreds of workers, tons of stone, and 100 carloads of steel arriving from Indianapolis as construction accelerates toward next season’s operations.
MENTIONED IN THIS ARTICLE
Anaconda
Amalgamated Copper Company
Deer Lodge
Siat
Warm Springs Creek
Indianapolis
Gregson
German Gulch
Elk Park
Welch's
Northern Pacific
Sreat
Bower
Anaconda Plant Expansion Marks Copper Industry Growth
Seventeen years of fixes and additions have transformed Anaconda and nearby plants into a sprawling copper complex. The Washoe and lower works plans, plus the Carrell expansion, push production toward a projected daily tonnage equal to the old plant. Foremen note 2140 workers, 1400 tons of coal daily, and 340 tons of coke powering roughly 500 tons of refined copper daily for refinery and Atlantic shipments. The shift to modern methods promises a future where older Brueckner furnaces fade as new machinery lowers costs.
MENTIONED IN THIS ARTICLE
Ivery
Washoe Works
Amalgamated Company
Butte
Cay
Atlantic Seaboard
Anaconda
Montana
Also Mentioned on This Page
Little Army of Mechanics
Qld
Upper-Works
Beman
Carrell
Carroll