Roblin children encounter roadwork on morning walk
Kids from Roblin Children's Centre watch a town crew remove an old sidewalk in front of The Review office and Roblin Recycling Depot on Sept. 27. A new sidewalk will be salted and replaced, signaling ongoing maintenance work in town.
MENTIONED IN THIS ARTICLE
Roblin
Review Office
Goose Lake lowering project to cut lake levels in Roblin
Roblin town workers start lowering Goose Lake and East Goose Lake to historic levels at a cost of 230000 dollars shared with the RM of Shell River. Pumping will run about 100 days in fall and resume next spring if needed. The project aims to relieve flood damage to campgrounds and lakefront properties after years of rising water.
MENTIONED IN THIS ARTICLE
Roblin
Goose Lake
Shell River
Schott
Also Mentioned on This Page
Monster Machine
Roblin Children’s Centre
Seman
Jessica Rawluk
Sto Town
Goose Lakes
1St Ave