Cairns City Works Contract Fee Dispute Document
Council received a detailed report from Ken Waaya on Cairns City Works. The note lists contract specifications, pipe and rail details, and a dispute over 90 extra units claimed by Rutherford. It references miscalculations in cubic yards and depth, planned vs actual excavation, and potential balance adjustments on the tender.
MENTIONED IN THIS ARTICLE
Wineer All
Mo I Cyeauly Lowing Senate
Cairns
Bonservetisar James
Rutherwok
Cain
Eubie
Ruthard
Sian
Sonereisulverin
Obscure construction notes reveal cost estimates and layouts
Fragmented OCR shows tentative building plans with rough dimensions, materials, and rent figures. Mentions concrete, timber, sheds, drainage cost estimates around £72 to £170, and foreshore work, with unclear site details and measurements.
MENTIONED IN THIS ARTICLE
Nacwide Works
Fort Vile
B.C
Rize
Florenn
The Quarries Cairns September 19 12K Monthly Material Output
The Quarries Cairns report for August shows concrete and gravel production totals and improvements. Crusher feeder modifications reduced dust, with updated chute and dust control equipment. Roadwork and street repairs progressed at several intersections, and contractors completed paving and painting along Wa directa and Pallis Way projects.
MENTIONED IN THIS ARTICLE
Cairns
James
Chabse
Kert
Shannellife
Steet
Shrek
Helene Iy
Fom
Pila
City Inspector’s Report on Health Violations in Cavans Area
The official report from Inspector Str. De W. Glasteon reveals numerous health and housing concerns in Cavans as of September 12, 1028. Inspections covered sanitation, living conditions, and compliance by residents and businesses, with actions noted and many cases referred for further enforcement.
MENTIONED IN THIS ARTICLE
de W. Glasteon
Officiel
Ita
Drovaution
Anton
loeWicrutue
Tom
Erviers
Suleet Abel
Cairns Water Supply Authority Meeting Notes 1938
The Cairns water supply authority meeting discusses engineering details, maintenance, and service improvements. It covers equipment notes including a suitable motor chassis and auxiliary components, with references to weather, consumption indicators, and projected timelines. Continuous updates on street water supply extensions and valve servicing are noted.
MENTIONED IN THIS ARTICLE
Cairns
Authority
Howe
Booster Pump Test in Cairns Shows Mixed Results
A 1928 Cairns report describes booster pump testing with mixed outcomes. Initial run failed, second attempt succeeded, delivering about 20,000 gallons per hour from creek and 25,000 gallons per hour when pumping into reservoir. Water depths and voltages noted, with concerns about water levels and valve action during trials.
MENTIONED IN THIS ARTICLE
Cairns
Tramiel
Sue
Mikel
Caine
Also Mentioned on This Page
Cairns City
Ken Waaya
Means
Tom Aye
Ensionas
Serge Far
Ivy
Peng Pt Cays
Amninoue
Cvetiea
Mmapwenit
al Iy
Peti
lareAl
Cyne Howie
Brent
Ion
Emlinire
Alors
Cavans
Scott
J. G. Wilks & Tr
P.O
Old
Spence Street
Engiverr
Matuyor
Mt. Ue
Cauineil
MR Cromyli
Fellowiry Commissi
H. Kelly
Hunthe Street
Sydsry
Merberton
the Thrifty Shoppers
Boland’s Ltd
Boland
LLANE
Rome
Bramlere
Ladieg
Poland
Boland Price
Ald Beeriiois
Iy Panben
Smart Prock
Ienlack Crepe-De
ENE
Tony Nlevwun
Anorte Colle
Piphias
Solamo
Pum Sakte
Fapisee
Beth
Hetle
Wyler
Boland’ Price
Xemp
Iin
Nistoesh Vy Velyen
Artificia Fashion
Shue
Huth
Lady Betty
Phill
Rolando Price
Herlice
Mane
Aiea
Roland
Owl Short Levine Waite
Willy Fennatl
Raileccaterest Sppns
Jean Soy
Otiattor
Alay
Naey
Wvbme
Aefy
Pale Vink
Manchester
Colgate
Inch Ban Toy
Land's Price
Wing
Wed
Salmon
Rowe
Rose Vale
Bink
Lemon
Saxe
Tuequoise
Talghi Crea
Dark
Wisk
Ica