Contract Let to Foster and Powers, of Morris. The contract has been let beg. the build ing of the new Catholic church. Foster Powers,of Morris, are the contractors and are to have §% completed April 10, 1004. ‘The church is to ‘far south. The main building 3 to be 42 by 08 feet be side the vestibule. The material used to to be prested brick, acet of building, $10, 700, besides the furnaces, furniture and plumbing which will bring them up to $15,000 .She contractors laid,onto the ground Monday and, summénged digging for the foundation on Weingaday, Sunday school doh ¥ enthon.wes held. at Aux Sable M. E. church last Samay after noon at 2 o'clock.D M Blackwekler, of Gardner, county president of the Sunday School association, War present and. gave the large audience in a tendancy a very interesting report of the work being, done for the Sunday schools in the county. Mrs, James Veeben, lying with her|