Greg Kohiweos/U S Navy photoTOMICH HALL, home of the Senior Enlisted Academy at Naval Station (NAVSTA) Newport, will receive a $5.2 million renovation.naveac Mtd-Attantc Putx»c Alters project is to provide unit system will saveThe Naval Facilitiesmuch needed improve- approximately $21,000 ments and repairs to per year when compared Tomich Hall, Coddington to alternative HVAC sys-Point, at Naval Station terns over a 40-year study Newport, said James life, said Lonnie Johns,(NAVFAC) Mid-Atlanticawarded a $5.2 millioncontract April 14 to Cut- NAVFAC Mid- NAVFAC Mid-Atlanticter Enterprises of Tol-land, Conn., for renovations to the Senior Enlist-architectural design manager anded Academy (SEA) at Teaiabranch supervisor for the architect. “This is about a Northeast Integrated $1 million life cycle costNaval Station (NAVSTA) Newport.Work to be performedsavings.The project also pro- Johns said other ener-vides an air-conditioning gy saving features used system. ... - throughout for this project are occu-re.P a^en!!nt 1° Building 1269 that will pancy sensors for light-. meet the Department of ing, photo cells for out-^US „8. system Navy's energy efficiency door lighting control andthe failed exterior msula-(EIFS), installation of agoals as well as cost sav- Variable Frequency Dri-IB* f• ings for the life cycle of ves (VFD) to control fansinstallation of new fire and smoke detectors, and complete fire alarm upgrades.“The mission for thisthe facility. “Theand motors, architecture/ The existing auditori-engineeringenergy um will also be renovat-study estimates that the ed. complete with newbuilding’s new fan coilSEA, Page 14