Article clipped from Dunkirk Evening Observer

Heavy City Trucks Could Not Be Driven in With Loads of Dirt for Fill-in. Because continued rain storing dure img the past few days have made the ground wet and sticky, geading work in Memorial Parkway practically at a standstill todays . Only fifteen of the original squid of fifty sven were working at the park today, spreaching roads of dirt which iwere dumped a short distance south of the Front street pavement. The heavy city trucks could not be drives far into the park today and as result thirty-five of the men who worked on the park last week were shifted to the lake front east of Main Street where some, grading, will be done. The west end of Memorial park has been graded, 2 strip extending from the filration plant 200 feet east being completed last week. “ The trench [or « 1M-foot wide cine der path wich will can parallel to the pavement from the filtration plant fo 8 point ningly feet west of Hagle street, was also dug dust week, 0” Eextra dirt for the fill-in at the lake fruit park ie being dug outside the sea wall just west of Main street.
Newspaper Details

Dunkirk Evening Observer

Dunkirk, New York, US

Tue, Apr 12, 1932

Page 6

Full Page
Clipped by
Profile Icon
Anonymous

USA 11 Oct 2026