| - DRILLING TEST HOLES' ■ J |The Handley Board of Trim- | f y. tees of Winchester, have award- y X ed the contract of sinking a X X number of test holes,' covering ? y the construction site of the XX Now Handley School Building y |; on the Equity property* to Win. X | Gochenour, Well. Drilling X y con tractor and Explosive deal- | er of Maurertown, Va.X.vThia work is being pushed A with all possible speed, and al-Y re^dy during the last week,X Mr; Gochenour has stink 15 test | holes through various forma-y tiphv: Samples of- the stratus X are being taken every five feet.❖ it hr likely 40 holes wilt be ~ drilled.