■’P ^ w * *President ProposesWater ProjectsWASHINGTON (AP) - President Ford proposed today the following federal water projects for fiscal year 1976 beginning 'July l. The work is to be performed by either the Corps of Engineers nr Bureau of Reclamation. The projects;UTAH Corps; None.Reclamation: Bonneville Unit irrigation, $14.3 million,, con* struction: Jensen Unit irrigation, $1 million* construction; Uintah Unit irrigation. $150,000, advance planning; Vernal Unit irrigation, $195,000 construction; Colorado River Basin Salinity Control, Crystal Geyser Unit water salvage, $53,000, advance planning; Emergy County irrigation, $824,000, construction; Lyman irrigation, $840,-000. construction: Recreationfacilities at existing reservoirs in slate, $9,000, construction; Transmission Division CRSP power, $45,000, construction; Weber Basin irrigation and power, construction.IDAHOCorps: Dworshak Dam and Reservoir, $4 million, multiple purpose construction, including power; Ririe Lake, $3.8 million, flood control construction.Reclamation; Boise Payette Division irrigation and power,$680,000, construction; Palisades Irrigalioji and power, $65,000, construction; Teton Basin, lower division irrigation and power, $16.2 million, construction; Upper Snake Salmon Falls Division, $500,000, advance planning no specific project designated.