New Braunfels Herald Zeitung, December 29, 1991

New Braunfels Herald Zeitung

View full pageStart a free trial

Issue date:

Pages available: 22

Previous edition:

Next edition: - Used by the World's Finest Libraries and Institutions

About New Braunfels Herald Zeitung

Publication name: New Braunfels Herald Zeitung

Location: New Braunfels, Texas

Pages available: 318,726

Years available: 1952 - 2013

Learn more about this publication


  • 2.13+ billion articles and growing everyday!
  • More than 400 years of papers. From 1607 to today!
  • Articles covering 50 U.S.States + 22 other countries
  • Powerful, time saving search features!
Find your ancestors now
Start your Genealogy Search now
See with your own eyes the newspapers your great-great grandparents held.

View sample pages : New Braunfels Herald Zeitung, December 29, 1991

Get access to these newspapers Plus 2.13+ billion other articles

OCR Text

New Braunfels Herald Zeitung (Newspaper) - December 29, 1991, New Braunfels, Texas oanvon Lane lads diameter conduit passing tinder th dam, with two 5 ('KH X inch bv IO foot hydraulic sink* gates lo controlled release ot water. •Canyon Dam is; located on the • uadulupc River approximately Id tiles west of San Marcos and I? ilies northwest til New Braunfels.' •Construction of the projec started in inly I‘TSH. Inn* madmen erf water began in lurk' 1964. * I he main dam is the highest irthcn dam built by the Ctarps of ngulcers in Texas, lowering 224 •et above streambed at its ijxtmurii point ami is 4.410 feet in scroll length The uncontrolled piltway t* 1.260 feet long. The <*ltM vt nrl s eiwisisf of a IO Oust •Initial tederal cost of the projec was S20.2 million including lex a interests' contribution of SI.-mrltiiW) during construction -Sunday-December 29,1991 Si fUto Prittnirlf IO MO 16 10/22/99 O-WEST MICROPUBLISHING 62? E YANDELL DR 75 cents Serving NEW BRAUNFELS and COMAL COUIT. 3 Sections, 38 Pagesdownstreamt lood waters Officials releasing r~| 5,000 cfs from dam /J Guadalupe River Basin By ROBERT STEWART SUH Writ.. Flooding above Canyon Lake last week led to a massive release of water from Canyon Lake Friday and Saturday. Campgrounds below Canyon Lake dam were safe from the increase flows Saturday, but the Gruenc River Crossing in Gnicne was flooded. The release of floodwater from the Canyon Lake reservoir into the Guadalupe River will continue for two to three weeks unless there is additional rainfall, said Sally Worst, public affairs officer for the U.S. Army Corps of Engineers. "Right now, 56 percent of the flood pool is filled with floodwater,” Werst said. “We want to get that back down as close to the conservation pool as we can without causing downstream flooding.” Outflow was increased to 2,500 cubic feet per second (cfs) on Friday and 5,000 cfs Saturday. Based on weather bureau projections, the Corps of Engineers feels that amount of water will not contribute to downstream flooding, Werst said. City of New Braunfels crews barricaded the Gruenc Road crossing of the Guadalupe River on Friday in anticipation of the release. By Saturday morning, the river was running over the bridge. The water outlet in Canyon Dam consists of a 10-foot-diameter conduit passing under the dam with two 5 foot 8 inch by IO foot hydraulic slide gates to control the release of water. These gates arc opened in gradual increments over time to reach the desired release level. "We look at the downstfeam conditions and make a determination based on that," she said. “Because if you get another enormous storm and another 56 percent fills up then you’re obviously going to go over the spillway.” The lake level on Friday was 930.64 feet above sea level. The normal conservation level is 909 feet. The top of flood level is 943 feet, at which point water goes into the spillway, Werst said. All parks at Canyon Lake are currently closed due to floodwater enlarging the lake. At normal level, Canyon Lake covers 8,240 acres. If the reservoir actually reached the top of flood level, Canyon Lake would cover 12,890 acres, Worst said. The highest pool at Canyon Lake came after heavy rain fell in May and June of 1987. The lake came within four inches of going over the spillway which is at 943 feet. “A lot of people think that if you go over the spillway, the dam is going to fail — it has nothing to do with that,” Werst said. ‘That’s what the spillway is there for but it would definitely be an uncontrolled spill and would definitely contribute to downstream flooding. So we’re just trying to do it in a more appropriate, managed manner (with this controlled release of water).” Werst added that the Corps is currently managing floods on the Trinity, Guadalupe, Brazos, and Colorado Rivers simultaneously. "It is a very unique situation,” she said. "As of (Wednesday), we were holding back over 950 billion gallons of floodwater (in all Corps of Engineers lakes in the flood area.)” Canyon Lake was holding back 67.5 billion gallons of that floodwater, she said. The reason that Canyon’s outflow was cut to 90 cfs on Dec. 24-25 "was because the stream banks were full and we didn’t want to release,” she Sh FLOODING, Pig* 2A Canyon Late: Gonzales Waler from Carryon Lake gushes through the flood gates as officials began releasing water at 5,000 cubic feet per second. (Photos by Bill Ervin) Victoria .Seadrift Gulf Intercoastal Waterway Judd McNett, left, and Gary Sanders, of the Corp of Engineers, began opening the gates of Canyon Dam with this control panel. Field increases to foul Emergency personnel load the victim of a vehicle accident In a Baptist Medical Hospital helicopter Saturday (Photo by Robert Stewart) Three-vehicle wreck sends victims to hospitals By ROBERT STEWART Mf WHtsr A three-uu accident at Farm-to-Market 725 and the iou lh Interstate 35 fromage road al 9:50 a,m. Saturday morning sent one New Braunfels man to the Medical Center Hospital in San Antonio via Airlife helicopter. “He had a possible cervical-spine injury,” said Captain Wesley Meyer of the New Braunfels Fire Department. “Hts respiration* concerned our paramedic.’' The name of the airlifted patient was hoi available Two other patterns were transported to McKenna Memorial Hospital ut New Bi aunt cis by EMS ambulance. Ruth L. Stallings of (lie SOU block of Smith Avenue and Robert Schneider of Seguin were treated and released from the bos Bee WRECK, Fag* SA in commissioner's race level on down need to file by the 2nd.” In addition to Powell and Zamora, other candidates who have filed for the Precinct 3 seat are Kookie Barboza and incumbent Paineio “Pal’* L. Hernandez. Zamora, a self-employed insurance agent and Democrat, said she hopes to boost the local economy as a member of the Commissioners Court by providing incentive programs to encourage the expansion pf businesses. Zamora also said she wants to spread the word to county ctuzens about the various education and job training programs that exist for them. In addition lo business experience, she cited community involvement as her major asset, saying she has volunteered time to assist individuals with vanous problems in her community foi (fie past 25 years. Powell, a Republican and co owner ot Arrowhead Fence and Supply Co, listed crime prevention, water supply and management, and 'working within a budget thai is Intr lo the taxpayer as hts i in ce main issues tor running for the position. ll) a pf opal eel Slat ell ie III. Powell stated (hat he has been active in the Republican Party as precinct chairman and serves on the executive committee of the Republican Patty of Comal County. Good rToda/iVigh will reach aSoinB- de glees and south winds will blow Connex...............»............ ....JOB about 5 lo IO miles per hour The I runs ol d. .................... pveriught low will reath about 43 Olar Abby...................... „.„.4b degrees, Fauci tam menu .......HA hjtieuum upc. ............... J -IOU I Inside; Opinions... ■...................... ...4- SA Buat fica*....................a Rec or da. .....t..............“t \ . .........-.......................... .....,..........._—. Spur IS.*....* migrant rara. .9* 124 Zamora By LARRY ROWE Staff Writer The Precinct 3 seat on the Comal County Commissioners Court gained two contenders this week, as local entrepreneurs Marc Powell and Cristina Zamora announced their candidacy. Meanwhile. Robbie Bore hers, chairman of the Republican Party of Comal County, said the Republican Party of Texas has advised all county candidates to file by the original deadline of Jan. 2, rather than the extended Jan IO deadline recently permuted by a federal court in Austin. She said it ii tam w bethel the extended deadline applies to local elections. “This is a gray area, and all candidates from the county Powell ;